Ground improvement measures are possible with the ground replacement method "Columbus+" / Commercial facility case study.
Powerful against weak ground! Strong against earthquakes, differential settlement, and traffic vibrations, and also excellent for underfloor insulation.
【Example of au Shop Minto-ya】―――――――――――――――――――― Unnan City, Shimane Prefecture; Construction in February 2012; Steel frame, one-story building; 300m2 / 30-year lease. In the case of piles, removal by extraction is a condition. Adopted to reduce removal costs. ――――――――――――――――――――――――――――――――― The ground replacement method "Columbus+" provides double benefits of differential settlement countermeasures and seismic resistance, making it effective against earthquakes and liquefaction. It is recommended for ultra-soft ground, pile foundations, friction pile foundations, designated archaeological areas, underground obstacles, periodic leases, vibration countermeasures, and earthquake countermeasures. By removing the heavy soil beneath the foundation and replacing it with lightweight EPS (expanded polystyrene) "Geoform," the weight of the building on the soft ground is reduced, thus minimizing settlement. Furthermore, it balances with the ground to prevent differential settlement, ensuring safety even on ultra-soft ground with deep support layers. For more details, please contact us or download the catalog.
- Company:ピーエルジー
- Price:Other